Home What We Do How We Work Quality & Compliance Compliance Hub Who We Serve About Insights Start a Sourcing Project โ†’
Quality & Compliance

Quality starts before production.

Quality control begins with the approved specification and continues through production and final inspection. Testing and compliance requirements are supported and can be coordinated where required.

The Control Process

Controlled against the approved specification

01

Approved Specification

The factory prepares a prototype or sample; Top Systems reviews it and can prepare a sample review report before client approval. Once approved, the physical sample and specification are retained as the production reference. The approved sample becomes the reference every production run is checked against.

02

Production Inspection

During production, goods are checked against the approved specification across the areas that determine whether a product is built correctly. Inspection exists to find problems early enough for the factory to act before shipment.

DimensionsMaterialsColour / finishConstructionHardwareFunctionWorkmanshipStrength / stability
03

Final Inspection

Before shipment, finished goods and packing are verified.

PackagingCarton markingsQuantityLabellingApproved sample / specDefects
04

Corrective Action

When an inspection finds an issue, we determine its severity, raise it with the factory and agree corrective action. Depending on the case that can mean rework or replacement, reinspection before release, and holding or delaying shipment where necessary. We escalate to factory management when required. Not every issue can always be corrected, but it is addressed at factory level rather than discovered on arrival.

05

Testing & Compliance

We have experience working with the product-safety, materials and packaging requirements common in commercial furniture. Top Systems is not a testing laboratory; testing can be coordinated where required, including with a laboratory you specify. Selected working references, including the inspection procedure, defect criteria and report templates, are available in our Resources.

Experience working with
  • BIFMA
  • ASTM
  • CARB Phase 2
  • TSCA Title VI
  • Formaldehyde requirements
  • Prop 65
  • ISTA
  • Drop testing
  • Carton testing
Illustration of a cardboard carton raised on a drop-test machine
Illustration
Retailer requirements experience

Requirements of the North American retailers our clients’ programs sell through.

Each standard is explained in plain English in the Compliance Hub.

Inspection & Test Documents

What you receive

These are the working templates our inspections, sample reviews and tests are recorded on. They are blank templates and illustrative examples, not client reports. Each opens as a PDF, and all are free on Resources.

Already have your own QC team?

Top Systems can work alongside your existing QC function. We provide local factory communication, production follow-up, physical factory inspection, third-party testing coordination, review of factory in-house test reports and corrective-action support where required. A complementary local production layer, not a replacement for your team.

Need production controlled against a spec?

Send us the drawing, photo, BOM or existing product and we’ll review the project.

@keyframes fadeUp { from { opacity: 0; transform: translateY(24px); } to { opacity: 1; transform: translateY(0); } }
Start a Sourcing Project โ†’